Does the OI gen 2 leaf board require the leaf PDM?

Posted: Sat Jul 26, 2025 8:43 pm
by rob1772
With my next conversion project, due to space/packaging arrangements I'll need to loose the PDM box that sits atop the leaf stack. I'll be using an Orion BMS and separate DCDC converter and charger. Will the OI gen 2 leaf board be able to function without the PDM?
I'm looking to use 2018 110kw stack.

Re: Does the OI gen 2 leaf board require the leaf PDM?

Posted: Sun Jul 27, 2025 11:02 pm
by Zieg
Yup you'll be fine.

Re: Does the OI gen 2 leaf board require the leaf PDM?

Posted: Mon Jul 28, 2025 4:05 pm
by Bratitude
rob1772 wrote: Sat Jul 26, 2025 8:43 pm With my next conversion project, due to space/packaging arrangements I'll need to loose the PDM box that sits atop the leaf stack. I'll be using an Orion BMS and separate DCDC converter and charger. Will the OI gen 2 leaf board be able to function without the PDM?
I'm looking to use 2018 110kw stack.
The OI board only effects the inverter and the pdm is not involved in anyway.

The 2018 110kw stack is a gen3 and the replacement board won’t work with it.

There is work being done (or was) on gen3 leaf inverter replacement boards, but they are not finished yet.

Right now canbus is the only method of control. Zombieverter will run it just fine

Re: Does the OI gen 2 leaf board require the leaf PDM?

Posted: Mon Jul 28, 2025 7:17 pm
by rob1772
ah... I thought it was the 130kw that were gen3. So at present, is it true to say the OI board will only work with the 80kw inverters?

Will the Zombie run the 130kw inverter standalone? ie without the nissan PDM/charger/DCDC and rest of the leaf stuff?

Re: Does the OI gen 2 leaf board require the leaf PDM?

Posted: Mon Jul 28, 2025 7:26 pm
by tom91
rob1772 wrote: Mon Jul 28, 2025 7:17 pm Will the Zombie run the 130kw inverter standalone? ie without the nissan PDM/charger/DCDC and rest of the leaf stuff?
Yes it can.

Re: Does the OI gen 2 leaf board require the leaf PDM?

Posted: Mon Jul 28, 2025 10:02 pm
by Bratitude
rob1772 wrote: Mon Jul 28, 2025 7:17 pm ah... I thought it was the 130kw that were gen3. So at present, is it true to say the OI board will only work with the 80kw inverters?

Will the Zombie run the 130kw inverter standalone? ie without the nissan PDM/charger/DCDC and rest of the leaf stuff?
130kw leaf inverter I don’t think exists, there’s a 80,110, and 160.

Zombieverter will run all of them over can (no pdm needed)

And the oi board only fits the 80kw inverter

Re: Does the OI gen 2 leaf board require the leaf PDM?

Posted: Mon Jul 28, 2025 11:10 pm
by Zieg
Oops, missed the 110kw bit. You might have gotten the 130 figure from reading about people getting about that much from the 80kw inverter + OI board?